Concrete Block Retaining Wall; August Involved Sweating
It’s done enough. At Move-In vs. Current: So the cap blocks aren’t actually done yet. I just set them on top. They need cut so they don’t have those gaps on the face. We’ll see when it happens. And sorry the angle’s off. Never took a before-photo of that corner — probably because the telephone